The following is a description of the tests carried out.

Brake Test. The cable is detached from the car, passed underneath it and connected behind the car. The car is loaded with 2 3/4 tons of ballast and there are four servants of the Tramway Company on the car at the time of the test. The car is pulled up the incline to near the points where the rails diverge to enable the cars to pass each other, the wagon just being held in front of it.

Edit History

2026-05-27 11:19:32 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
C. O. 102 10930 Enclosure 3. RECO Minute by the TRE. 25 JUN J4: Director Aching of Intlic Works. The following is a description of the tests carried out. Brake Test. The cable is detached from the car, passed underneath it and connected behind the car. The car is loaded with 2 3/4 tons of ballast and there are four servants of the Tramway Company on the car at the time of the test. The car is pulled up the incline to near the points where the rails diverge to enable the cars to pass each other, the wagon just being held in front of it.
Baseline (Original)
C. O. 102 10930 Enclosure 3. RECO Minute by the TRE. 25 JUN J4: Jirector Aching of Intlic Works. The following is a des- at present cription of the tests carrica out. Brake Fest. The cable. is detached from the car, passed" underneath it and connected wayou car Fo The fours of Company behind the car. is loaded with 23/4 ballast and there are servants of the Framway erv the Car at the wagon time of the test. The is pulled up the incline to near the points where the rails diverge to crable the cars to pass cach other, the car Just being hed in front of it. The wagon.
2026-05-27 11:19:32 · Baseline
View content

C. O. 102 10930

Enclosure 3. RECO

Minute by the

TRE. 25 JUN J4:

Jirector

Aching of Intlic Works.

The following is a des-

at present

cription of the tests

carrica out.

Brake Fest. The cable.

is detached from the car, passed"

underneath it and connected

wayou

car

Fo

The

fours

of

Company

behind the car.

is loaded with 23/4

ballast and there are

servants of the Framway

erv

the

Car

at the

wagon

time of the test. The

is pulled up the incline to near the points where the rails diverge to crable the cars to pass cach other, the car Just

being

hed in front of it. The

wagon.